Jump to content

Pagination need on admin for schedules


TennShadow

Recommended Posts

Hello,

I think pagination is needed on the admin side for the schedules.  I have 3400 routes and it tries to load them all on one page.  I'm thinking a drop down type box asking how many records to display per page would be cool.  No big deal if this is not possible.  Just a suggestion.

In fact, this could be cool on the public side as well in the schedule area.

Thanks,

Keith

Link to comment
Share on other sites

Hi all! Yeah I mentioned this a while back as well. Another place good for it would be the all pireps page in the ACP (Admin Control Panel), and maybe the view schedules page as well via the Pilot Center. I do not have NEAR as many schedules as some do here and I find on the pages that show routes available 7 days a week, get VERY long.  ;)

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...